Login
or
Register
Home
»
Trains Magazine
»
Forums
»
General Discussion
»
Manned Helpers Back on Donner Pass.
Edit post
Edit your reply below.
Post Body
Enter your post below.
[quote]QUOTE: <i>Originally posted by M.W. Hemphill</i> <br /><br />UP promised to re-install the second main track on Donner Pass? When was that promise made, and where was it made? That's news to me. <br /> <br />I do not think that stretch of single main track will ever be a bottleneck in the rest of my life.[/quote] <br /> <br />The only part of the Donner route that will probably never be retracked is that section of No. 1 track between Norden and Shed 47. <br /> <br />As soon as project ReTRAC is completed, and Union Pacific's capital budget can afford it that section of Number One track between Switch 9 and Shed 10 will be retracked. <br /> <br />This because the Port of Oakland will be pumping out more and more eastbound loads. <br /> <br />My opinion <br /> <br />Jim B -Lawton, NV
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy