Login
or
Register
Home
»
Trains Magazine
»
Forums
»
General Discussion
»
Teach me please
Edit post
Edit your reply below.
Post Body
Enter your post below.
<p>[quote user="rdamon"]Interesting video ... Not in German ;) Warning Bad Language [/quote]</p> <p>Thank you for posting. I hadn't seen the dash cam videos before.</p> <p>It sounds like a reasonable explanation what happened. The why is not so plain for me.</p> <p>When in the final position the strut, that might have caused the failure, is a compression member. When on the SPTMs during transport that same strut was a tension member as the bridge end cantilevered in this state.</p> <p>So let's assume the strut was pre-tensioned for the transporting state so that there were no tensile stresses left to avoid cracks. When the bridge was placed on the columns there was compressive stress added to the already compressed strut it seems.</p> <p>But not really. Additional compressive force means the strut gets shorter with the pretensioning bar inside getting shorter too and loosing part of is tensile force on the way.</p> <p>So what was the reason to get to this tensioning bar again? And why let loosing this bar let the bridge collapse? According to the drawing there were three more tensioning bars in that strut. For me it looks like the last strut survived: <a href="https://cdn.cnn.com/cnnnext/dam/assets/180315142241-02-bridge-collapse-screengrab-0315-exlarge-169.jpg">https://cdn.cnn.com/cnnnext/dam/assets/180315142241-02-bridge-collapse-screengrab-0315-exlarge-169.jpg</a><br />Might have been the second diagonal strut. During transport it was compressed but in the final position it was a tension member. From my point of view correcting the pre-stressing power in this diagonal makes more sense.</p> <p>I feel it is still speculation. Perhaps the proposal reveals some more information.<br />Regards, Volker</p> <p>PS.: Here is the proposal for the bridge: <a href="https://facilities.fiu.edu/projects/BT_904/MCM_FIGG_Proposal_for_FIU_Pedestrian_Bridge_9-30-2015.pdf">https://facilities.fiu.edu/projects/BT_904/MCM_FIGG_Proposal_for_FIU_Pedestrian_Bridge_9-30-2015.pdf</a></p> <p>Edit: Link replaced</p>
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy