hoosac tunnel
Posted by blue streak 1 on Friday, February 21, 2020 8:15 PM

It is not going to open for a while yet.  Have to wonder just what happened inside the tunnel.  It can also mean Pan Am is finding additional spots that may be prone to collaspe ?.  Maybe tunnel roof has sagged ?  Need a good report to squash my speculation.

http://www.nscorp.com/content/nscorp/en/service-alerts/hoosac-tunnel-service-disruption.html?fbclid=IwAR3KFwc93ZOiospcSriWYuxK-4F6LC_5XdauNDkCNIFAa1FAOl91DGdF8ss

 

  • Member since
    May 2003
  • From: US
  • 24,934 posts
Posted by BaltACD on Friday, February 21, 2020 8:27 PM

blue streak 1
It is not going to open for a while yet.  Have to wonder just what happened inside the tunnel.  It can also mean Pan Am is finding additional spots that may be prone to collaspe ?.  Maybe tunnel roof has sagged ?  Need a good report to squash my speculation.http://www.nscorp.com/content/nscorp/en/service-alerts/hoosac-tunnel-service-disruption.html?fbclid=IwAR3KFwc93ZOiospcSriWYuxK-4F6LC_5XdauNDkCNIFAa1FAOl91DGdF8ss

 

Was Hossiac lined or left in 'as dug' condition?

Never too old to have a happy childhood!

              

  • Member since
    January 2019
  • From: Henrico, VA
  • 9,571 posts
Posted by Flintlock76 on Friday, February 21, 2020 8:45 PM

Here's the story from a local paper.  It looks like a portion of the tunnel liner near the west portal has collapsed.  Since the tunnel is 4.75 miles long I doubt the whole tunnel's lined, most likely it's only lined for a distance from the portals.

http://www.recorder.com/a1-hoosac-tunnerl-collapse-BE-SATURDAY-32695841  

  • Member since
    September 2003
  • 21,327 posts
Posted by Overmod on Friday, February 21, 2020 9:41 PM
  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,786 posts
Posted by mudchicken on Saturday, February 22, 2020 10:27 AM

Keeping the 15" roadheader exercise from several decades ago in mind, wonder if water mechanical action did a number on the parent rock behind the liner (ungrouted - due to its age). The concrete & Stone brick failed with age and the crumbling, ungrouted rock behind the liner pushed it out* by vibration and pure weight.

Photos of the approaches make them look like swamps - constant condition? Steel sets configured to what they want for future clearance as the solution?  ($$$ to an outfit essentially cheap, will NS help pony up?)

*with water as a lubricating/mechanical agent, especially in winter.

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Saturday, February 22, 2020 12:11 PM

Geologic conditions through the 4.75 mile long tunnel are quite variable - ranging from hard rock to essentially sand - as I recall from the main book on the subject, A Pinprick of Light

https://www.amazon.com/Pinprick-Light-Greenfield-Railroad-Hoosac/dp/1881535177 

See also https://www.amazon.com/Builders-Hoosac-Tunnel-Cliff-Schexnayder/dp/1942155077 

It's always had a problem with water drainage - there are several small streams that flow down the mountain over top of it (including Tunnel Brook right over the western portal).  Also, it looks like a swamp at the east end becasue Cascade Brook is right next to the track.  Also, no one has ever done a basic drainage project to pipe it away, esp. at the eastern end - it's not far to the Deerfield River, 600 ft. +/-.  The tunnel no longer has doors, so a recent cold snap up that way could have caused more freeze-thaw cycles - same action that causes potholes in roads - which led to the rockfall. 

See the photos at this website: https://www.atlasobscura.com/places/hoosac-tunnel 

More information - such as the length of the damaged area? - would be helpful.  

- PDN.  

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,826 posts
Posted by blue streak 1 on Friday, February 28, 2020 12:56 AM

Latest bulletin from NS. Mid March for tunnel to reopen.  However NS has arranged for detour traffic for allmost comodies including auto carriers.  Ayer traffic still embargoed is Auto and intermodal. There must be a real problem inside the tunnel bore ? Sure would like some one to be a fly on the wall !

http://www.nscorp.com/content/nscorp/en/service-alerts/hoosac-tunnel-service-disruption.html

 

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,826 posts
Posted by blue streak 1 on Friday, February 28, 2020 1:15 AM

Is it possible that the tnnel reopening delay might be for making it domestic double stack capable /?  Or is it already capable.  Pan Am's clearance diagram does not show the route domestic double stack capable .

http://www.panamrailways.com/maps-and-routing-guide 

 

  • Member since
    September 2003
  • 21,327 posts
Posted by Overmod on Sunday, March 1, 2020 7:41 PM

blue streak 1
There must be a real problem inside the tunnel bore ? Sure would like some one to be a fly on the wall !

I wonder if any of it is related to this 1979 story on steel liner.

https://static1.squarespace.com/static/53a3b0e7e4b0356e962ad8f4/t/5e4b1d382ab0db77e58c82bf/1581980985377/1979_Berkshire_Eagle_%27Hoosac%2BSteel%2BLiner%27.pdf

Further reading in the B&M archives indicates this was not exactly a 'steel liner'; it was little better than corrugated tin roofing material, and was used as an in-place form for tremie concrete ... against 13 courses of who-knows-how-deteriorated brick in the 'wet' part of the tunnel.  

Much of the rest is 'rock' with no liner apparently needed up to the late '70s ... to hear them tell it at the time.

I do have to think that deteriorated concrete and rusty thin metal, almost certainly without any sort of bonding to the brick, is going to be a big piece of the puzzle here.

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,786 posts
Posted by mudchicken on Sunday, March 1, 2020 10:21 PM

The problem is most likely where the steel liner isn't. Geology is fickle and unpredictable. The response and the contractor equipment used will speak volumes. Local geologist or national tunnel expert/ consultant calling the shots? And how good are the rcords for the past 50 years and did ST/B&M keep the records (or did some lowlife operating manager (in this case PanAm/Mellon) deem those records not important to keep?)

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    February 2007
  • 8 posts
Posted by tgoodwin on Monday, March 16, 2020 9:18 AM
To answer your question, most of the length of the tunnel is unlined. I know that because of a 'youthful indiscretion" where I and two college friends bicycled through the tunnel on the service road next to the tracks. Remember that there were originally two tracks in the tunnel, but it was reduced to one track in the middle to gain enough clearance for piggyback traffic - henc room enough for a road next to the tracks.
  • Member since
    October 2006
  • From: Western, MA
  • 8,571 posts
Posted by richg1998 on Thursday, March 19, 2020 10:47 PM

I just saw an infra red camera video today and I did not see any lining but might have missed it. Good video.

https://www.youtube.com/watch?v=PFjZJet_9VQ&feature=share&fbclid=IwAR2IlZCuioWtgL3kpprvWr52jaC68kgGYbpKjbrbY8_K_Vgjaw1YViUlXq8


Just saw a drone video. Big hole in the ground.

https://www.youtube.com/watch?v=Wip1Q3m1RNY&fbclid=IwAR24ACKG0P48Hbmve7S5GgY1-72JZk3SM0RC8CRZX_lW8jrvmX_XZR591Vs

Rich

If you ever fall over in public, pick yourself up and say “sorry it’s been a while since I inhabited a body.” And just walk away.

  • Member since
    August 2012
  • 22 posts
Posted by sno-cat on Tuesday, March 24, 2020 8:49 AM

Water continually flows out both ends of the tunnel due to water penetrating into the tunnel from above. The west end of the tunnel is lined with brick for a while and it occasionally falls in. Also there isn't really a service road next to the tracks.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy