Trains.com

Warehouse Tracks

1616 views
6 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    February 2016
  • From: Texas
  • 1,552 posts
Warehouse Tracks
Posted by PJS1 on Thursday, May 31, 2018 4:32 PM

A number of warehouse tracks branch off of the Trinity Railway Express line just north of Dallas.  They probably would be served by the Dallas, Garland, and Northeastern Railroad.

Along one of the warehouses the tracks have been taken up.  But along two or three other warehouses the tracks are in place.  Knee high weeds growing between the rusty rails suggest that the tracks have not been used in a long time.

Who likely owns the tracks that run up to the warehouse loading doors?  And who would pay to have them removed?  Would there be enough value in the rails, ties, etc. to offset the cost of removing them?

Rio Grande Valley, CFI,CFII

  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Thursday, May 31, 2018 4:44 PM

I seriously doubt that the salvage value of any unused track would pay for the cost of removing the track. You can find unused track in many places; four years ago, I was given a tour of what is and what was in Shreveport by a good friend and fellow poster (now departed this life), and there was much track that had not been used in many years. I doubt that any of the unused track has been taken up unless it was in the way of something new in the location.

Johnny

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Thursday, May 31, 2018 7:34 PM

PJS1

.

Who likely owns the tracks that run up to the warehouse loading doors?  And who would pay to have them removed?  Would there be enough value in the rails, ties, etc. to offset the cost of removing them?

 

Where the warehouse is in a stand-alone location where the tracks leading up to the building serve only this one facility, the tracks likely belong to the building owner starting at the property line.

In densely built-out industrial parks, where individual properties are seperated by rail sidings running down the property line between them, it can be considerably more complex. (typically a track running along side each adjacent building... serving it's doors, and a third "drill"  track running right down the center between those) Who controls that third, center track, can be  almost anyone.

Rather than pulling them up for scrap, what we usually did was to just pave over them, gaining the space back for empty trailer storage, or employee parking.

To be sure, the paving bubbas will tell you  that's a bad idea from a paving standpoint, and the track bubbas will tell you that's a bad idea from a track standpoint.

But the fact of the matter is, this is the cheapest way for the building owner to regain productive use of this portion of his property, so it's often done.

If, otoh, you intend to install truck docks in the wall where previously the rail siding served, you would definitely want to pull up the tracks completely before paving.

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Thursday, May 31, 2018 9:07 PM

Although it varies from place to place, and even along the same railroad (usually depends on when the siding was installed):

  • The industry, from the RR's ROW line on up to it
  • Same
  • Depends - mainly on the length of the track(s), if any good turnouts (or other special track work) is included, the weight of the rail and its condition, the number of salvageable ties vs. junkers that have to be disposed of legally, access to the site for the removal contractor - and most of all, the going price for such scrap metal to make it all worthwhile.   

These days, generally such sidetracks are scrap value only - nothing worth reusing, so they're marginal for removal on an economic basis alone. 

- PDN. 

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Thursday, May 31, 2018 9:35 PM

Paul_D_North_Jr

Although it varies from place to place, and even along the same railroad (usually depends on when the siding was installed):

  • The industry, from the RR's ROW line on up to it
  • Same
  • Depends - mainly on the length of the track(s), if any good turnouts (or other special track work) is included, the weight of the rail and its condition, the number of salvageable ties vs. junkers that have to be disposed of legally, access to the site for the removal contractor - and most of all, the going price for such scrap metal to make it all worthwhile.   

These days, generally such sidetracks are scrap value only - nothing worth reusing, so they're marginal for removal on an economic basis alone. 

- PDN. 

 

(+1 to PDN's comment) ...and it's a good bet that the commercial real estate lizzard is: (a) marketing the commercial building with the track gone as "rail served"; (b) trying to tell the uninformed buyer that the railroad will build and maintain the track just to get the business and will switch it anytime at the buyers beck-and-call; (c) has no idea whose contract was last in place to own-operate-maintain the track (can it be assigned? is there a valid contract? ... it ain't at the courthouse bubbawits!) and (d) what railroad serves the industrial lead.

Also bet the farm that the other two unused tracks now have clearance violations & drainage issues created by the building owner and have never had a track inspection (or record of) on the building owner's side of the division of ownership.MischiefMischiefMischief

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Friday, June 1, 2018 9:10 PM

I know of one situation that matches mudchicken's (a) above - specifically, the track's still there along the building and for quite a distance beyond it, but the turnout from the main line is gone.  The prospective buyer now knows better Whistling  Smile, Wink & Grin . . . and has turned the table by writing into the contract that the seller promises the sidetrack is presently usable.  Now guess what happens to the seller when it turns out* that the sidetrack isn't usable?

- PDN.  

*Pun not intended

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Saturday, June 2, 2018 10:17 AM

Paul_D_North_Jr
but the turnout from the main line is gone.

Little reason to pay 5 figure annual switch maintenace fees, when the railroad isn't willing to provide competitive service, is there?

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy