Login
or
Register
Home
»
Trains Magazine
»
Forums
»
General Discussion
»
Track work is complete here on NS..
Edit post
Edit your reply below.
Post Body
Enter your post below.
I got to be part of an unusual method of rail repair today. A wye on the west side of town was out of service. On our way to the west side of town the MOW dept. was working on some rail by the CSX/NS diamond. We were briefed that we would have to drag two 400ft pieces of welded rail through town to the wye. The rail was chained to the front knuckle, a front end loader with some hook attachment positioned the rail in between the existing rail and we starting dragging. Now, knowing that people would probably go through road crossings as soon as the engine passed we had about 4 MOW trucks stopping at crossings to protect and then racing onto the next crossing. We shoved with a caboose and just crawled through town. Probably the only time I'll ever see something like that! [tup][swg]
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy