Login
or
Register
Home
»
Trains Magazine
»
Forums
»
General Discussion
»
Difference between "Double Track" and "Two Main Tracks"
Edit post
Edit your reply below.
Post Body
Enter your post below.
<p>By general (if not book) definition a center siding is connected to both main lines, i.e., if you say "center siding" to someone, they would recognize you're talking about a siding that lies between the two main lines connected to both, usually with an equilateral turnout on the siding itself leading to hand-throw main line turnouts, and spring switches on the two leaving turnouts off the main tracks. There are some instances where there is a siding between the double track that is connected to only one of them, but almost invariably this occurs in a location where the two main tracks are widely separated for reasons of local topography. </p><p>Note that a center siding has a dual function; it's also the crossover between the main tracks.</p><p>S. Hadid </p>
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy