Steam & Preservation

Contemporary mainline steam excursion operations, museums, tourist railroads. Learn about restorations, talk about techniques, and discuss the future of railroad museums. If you're new here, please read our forum policies.

Last post 11-21-2009 9:36 PM by TomDiehl. 0 replies.
Rate:
Sort Posts:
Page 1 of 1 (1 items)
11-21-2009 9:36 PM
Offline TomDiehl
Top 75 Contributor
Joined on 02-20-2001
Poconos, PA
Posts 3,820

Repairing EBT Equipment with EBT Equipment

This month's work session with the Friends of the East Broad Top included some parts repair being done in the East Broad Top's Machine Shop, with an original machine bought new by the EBT in 1906. Repair work was done to the suspension links for the rebuilding of Combine #14

After welding, the holes were reamed to the proper size, top holes 1-3/8 inches, bottom holes 1-1/2 inches. Note the motor unit in the background powering the Cincinnatti Drill Press in lieu of the overhead belt system. Motor unit and photos by Dave Richards.

The top hole needed a 45 degree chamfer.

Next season, we hope to have the wiring done for the Lodge and Shipley 22 inch lathe. Cleaning and lubrication is already done on this machine, also bought new by the EBT in 1906. We need to fabricate 4 new hangers for the same project.

Page 1 of 1 (1 items)
Copyright © 2009 TRAINS.COM
Powered by Community Server (Commercial Edition), by Telligent Systems
Subscriber and Member Login
E-mail Address:
Password:
Remember me
My Profile
Screenname: (get your screenname)
Search Community
in