broncoman: Are they going to change the directions that trains are run. I am not sure if its due to construction or not buy the eastbound empty autoracks have been on the westbound track through Auburn the last couple of days, so has the local which I am assuming goes up to Colfax? I haven't seen anything with helpers going this way. Is the new crossover at Bowman behind Head Quarter house?
Thanks for the info.
The crossover is directly behind Americast Stone Inc. building, which is about one thousand feet or so west of the Head Quarters. We were up there picking up some precast concrete pieces and talked to the U.P. crew behind the building and looked at the newly installed crossover and the electric machines to operate it.
As Timz has said, the operation will allow the double eastbound double stacks to bypass the newer track #2 between Bowman and Colfax. The double stacks will use the # 1 track both directions but the other trains will probably still use the newer # 2 uphill since its grade is lower.
Another use might be for Amtrak to use the #1 eastbound if they need to pass a slower freight between Bowman and Colfax. The Roper eastbound freight normally waits at Newcastle if it leaves Roseville yard prior to #6 arriving. In that case, #6 runs up the steeper older #1 track to Newcastle and then it runs around the freight at Newcastle and then uses the crossover at Newcastle to use the # 2 track on to Colfax.
CZ
Americast Stone, INC