Layouts and layout building

Benchwork, scenery, track, and more. If you're building a scale model train layout, this is where to go. If you're new here, please read our forum policies.

Last post 07-04-2009 5:44 PM by ccturnouts. 19 replies.
Rate:
Sort Posts:
Page 2 of 2 (20 items) < Previous 1 2
07-04-2009 3:41 PM In reply to
Offline All things Ohio
Not Ranked
Joined on 01-22-2007
Posts 14

Re: FastTracks dual gauge sad realization....

Good points to consider...

 I was actually looking at the Fast Tracks products. Maybe I need to re-evaluate a few things.

07-04-2009 4:37 PM In reply to
Offline Midnight Railroader
Top 200 Contributor
Joined on 10-27-2006
Denver, CO
Posts 1,855

Re: FastTracks dual gauge sad realization....

All things Ohio:

Good points to consider...

 I was actually looking at the Fast Tracks products. Maybe I need to re-evaluate a few things.

 

 

Anyone can learn to handlay track.  Anyone. Just takes patience to learn, like anything else in life.

No offense to FastTracks, but I'm not going to spend that kind of money for something, that, if I do it myself, is cheaper than buying flextrack and commercial TOs.

07-04-2009 5:03 PM In reply to
Offline yankee flyer
Not Ranked
Joined on 12-28-2007
Gateway City
Posts 460

Re: FastTracks dual gauge sad realization....

Do you buy rails and ties seperately or cut up flextrack?

Lee

07-04-2009 5:22 PM In reply to
Offline Midnight Railroader
Top 200 Contributor
Joined on 10-27-2006
Denver, CO
Posts 1,855

Re: FastTracks dual gauge sad realization....

yankee flyer:
Do you buy rails and ties seperately or cut up flextrack?
 

I have a supply of old Atlas c100 NS flex, so that worked out well. (But I have in the past bought rail--it is not too expensive.)

I cut ties from basswood (stripwood); also very cheap, although I am not 100% certain they end up costing less than some bulk ties. Feels less expensive, though.

Spikes, 4 per tie, are ME or Walthers. These go faster than you'd think when you're laying track.

 

 

07-04-2009 5:44 PM In reply to
Offline ccturnouts
Not Ranked
Joined on 05-29-2009
Thomas
Posts 18

Re: FastTracks dual gauge sad realization....

 On my layout and some modules that I'm doing, I don't use PC Boards.  Except for my turnouts on hidden track

 

 

Page 2 of 2 (20 items) < Previous 1 2
Copyright © 2009 TRAINS.COM
Powered by Community Server (Commercial Edition), by Telligent Systems
E-mail Address:
Password:
Remember me
Get Newsletter
Get our free weekly newsletter delivered to your inbox
My Profile
Screenname: (get your screenname)
Search Community
in