Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

June 2017 Ask MR

1226 views
2 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    September 2003
  • From: Omaha, NE
  • 10,614 posts
June 2017 Ask MR
Posted by dehusman on Thursday, April 27, 2017 11:15 PM

A couple notes on the answers to the Ask MR column in the June issue.

On the question about a new spur, you can check the major class one railroad's websites and there will be the railroad's processes and standards for industrial track and development listed, for example here are the UP's pages :

https://www.up.com/customers/ind-dev/developers/index.htm

and the track design specs:

https://www.up.com/customers/ind-dev/operations/specs/track/index.htm

On the question about cranes:

Technical point, the question was about cranes for "maintenance crews" to use, but the picture was of a wrecking crane.  "Maintenance" implies the "maintenance of way" which is the engineering department.  The wrecker belongs to the mechanical department.  The engineering department has bridge and "Burro" cranes but they are not designed to or used to pick up cars.  Bridge cranes work on bridges, track panels and pile drivers, Burro cranes pick up small pieces of track material (rails, frogs, crossing panels, etc).  Wrecking cranes are designed to pick up cars and locomotives.  Wrecking cranes can be used to pick up track panels at a derailment and assembled bridge girder sections (because they heavier than most bridge cranes can handle).

Generally though wreckers are not used by the maintenance of way and the people who operate and maintain them are not engineering employees.

 

Dave H. Painted side goes up. My website : wnbranch.com

  • Member since
    October 2001
  • From: OH
  • 17,574 posts
Posted by BRAKIE on Friday, April 28, 2017 7:38 AM

Dave,In my 9  1/2 years experience I seen MOW/B&B crew use a wrecker  once because of the heavy lifting involved a replacement steel bridge grider.

Now if Chessie could have used a contractors heavy duty crane to do the work they would have since it would have been cheaper.

Larry

Conductor.

Summerset Ry.


"Stay Alert, Don't get hurt  Safety First!"

  • Member since
    September 2003
  • From: Omaha, NE
  • 10,614 posts
Posted by dehusman on Friday, April 28, 2017 10:15 AM

Its pretty rare, but it happens.  Conrail was upgrading the "high line" bridge through Phillie and had both the CR and AMTK wreckers on a work train on one main track and a second train on the other main.  The wreckers had a flat between them.  They would pick up a bridge section, set it on the flat, pull back to the other train, set the old bridge section on an empty car on that train, pick up the new section and put it on the flat between them, shove back out to the "hole" and set the new bridge section in the hole.  They replaced 3 bridge sections that way, using the same spreader bars they would use to pick up an engine.

This was back in the late 70's.

Dave H. Painted side goes up. My website : wnbranch.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!