QUOTE: We're doing a 'closed world' i.e. there are no staging tracks or interchanges with places that exist 'off the table'. We presume such interchanges do exist (somewhere 'off the table' ) to allow some foreign cars to run, but the backbone of the operations will be based around shipping raw goods and finished products between various places that are all on the layout.
QUOTE: Originally posted by jwr_1986 Still I'm interested in your track plan and who ships what and how much.
QUOTE: Originally posted by CBQ_Guy With the short distances we can model between locations on our layouts, most if not all of the exchange from one layout business to the next would be via truck.
http://mprailway.blogspot.com
"The first transition era - wood to steel!"