QUOTE: Originally posted by CARRfan Cons (for Solder & PC ties): - Can't use pre-weathered rail (which may be a pain for making turnouts anyway) As for Spike Pros: - Could use pre-weathered track
QUOTE: For those that solder to PC ties, and don't use pre-weathered rail, how do you weather your rail afterwards?
Rob Spangler
QUOTE: Originally posted by dinwitty I handlaid my layout years ago and well, handlaid spikes are too big.
QUOTE: Originally posted by dinwitty most today's flex track have excellent detail.
QUOTE: Originally posted by CARRfan wp8thsub, What do you use for roadbed? That's a con of spikes I neglected to mention - they can't be driven into cork for sure. I've played around with hand-laying directly into pine 1 x 4's, etc., but am at a loss as to what to use for elevated roadbed.
I'm back!
Follow the progress:
http://ogrforum.ogaugerr.com/displayForumTopic/content/12129987972340381/page/1
QUOTE: Originally posted by CARRfan wp8thsub, What do you use for roadbed? That's a con of spikes I neglected to mention - they can't be driven into cork for sure.