Ray Breyer
Modeling the NKP's Peoria Division, circa 1943
Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
QUOTE: Originally posted by jesionowski I have three Dremel's one I purchased way back when and the second with variable speed which is great, (I won that one at an NMRA convention), and my wife gave me one of the cordless ones. I have used the cordless one for many uses and it has two speeds 5,000 and 10,000 rpm and it does most everything I need. Rick
ChuckAllen, TX
QUOTE: Originally posted by Jetrock --if I hadn't found a lightweight drill press at a garage sale I would have gotten the drill press attachment by now!