Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
QUOTE: Originally posted by dmac730 That EZ Track is all crap. I spent alot of money buying it along with a few turnouts and my trains derailed over every one of them. I threw it all in the trash and now I am laying Atlas on foam roadbed, Much much better, and cheaper too!
QUOTE: Originally posted by cnwrwyman I have found that Kato No. 6 switches work very good. I have had less success with Kato No. 4 switches. Kato switches are very easy to hook up. It is quick and easy to make a complete layout with Kato unitrack and Kato switches and it is also easy to change the layout any time you want to. Larry