Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Solder or not to Solder that, is the question

1406 views
8 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    April 2003
  • 305,205 posts
Solder or not to Solder that, is the question
Posted by Anonymous on Friday, August 20, 2004 7:31 AM
I heard recently and from a "reliable" source that you should solder all joints where 2 pieces of track come together. What say you "oh great and wonderful guru's"
This newbie is confused [banghead]
  • Member since
    March 2002
  • From: Elgin, IL
  • 3,677 posts
Posted by orsonroy on Friday, August 20, 2004 8:09 AM
I say solder MOST of the track joints. Leave a few free to provide for expansion joints, but otherwise solder 'em. It really makes a difference in electrical reliability. Also, drop feeder wires every 3-6 feet.

Soldering isn't hard, it's just something you have to practice at. Once you get the hang of it, it becomes second nature.

Ray Breyer

Modeling the NKP's Peoria Division, circa 1943

  • Member since
    October 2002
  • From: City of Québec,Canada
  • 1,258 posts
Posted by Jacktal on Friday, August 20, 2004 8:16 AM
You have two things to consider here...electrical conductivity and metal expansion due to temperature changes.My suggestion is to have an open joint every three feet or so,so that your tracks can expand and contract to a certain degree without creating wrinkles in your trackwork.0015-0020 in. gaps should be okay and won't hurt operations with well aligned tracks.Then every three feet section needs to be linked with feeder wires through the benchwork to either a bus wire or a block control switch as per your layout's electrical diagram.
  • Member since
    May 2003
  • From: US
  • 1,398 posts
Posted by fiatfan on Friday, August 20, 2004 8:39 AM
When laying curves, I solder two pieces of flex track together and then form the curve. This reduces the chances for kinks (which are a bad thing on curves). The rest of the rails are connected using rail joiners. If I have a problem with poor contact, I solder that joint. Otherwise, evertything else is left unsoldered.

Tom

PS Welcome to the group!

Life is simple - eat, drink, play with trains!

Go Big Red!

PA&ERR "If you think you are doing something stupid, you're probably right!"

  • Member since
    January 2001
  • From: US
  • 1,300 posts
Posted by Sperandeo on Friday, August 20, 2004 8:55 AM
Hello "confused,"

I agree with the solder-on-curves-and-not-on-tangents (straight track) approach. I'll add that I not only leave rail joints in straight track unsoldered, in my HO track I also make sure there's a space the width of an NMRA gauge between the rail ends in the joiner. I also solder a feeder to every length of rail, and this is especially important where you leave the joints unsoldered. Rail joiners that aren't soldered will not be reliable electrical connections over time, particularly when you paint, ballast, and weather your track.

Good luck,

Andy

Andy Sperandeo MODEL RAILROADER Magazine

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, August 20, 2004 9:19 AM
I would like to thank everyone for their replies. I guess I need to pactice my soldering. Ain't done none in "years". But that's ok. I have a decent size box of left over track to practice on. As far as expanding the layout goes....."no way"! At least that was the answer I got from SWMBO! Current layout is 5' x 12' and will probably have to stay that way. Of course what I didn't say was there's approx 40' of HO race track sharing the benchwork. [:D]
  • Member since
    December 2002
  • From: US
  • 665 posts
Posted by darth9x9 on Saturday, August 21, 2004 10:40 AM
A good practice is to solder every other joint on the straight (semi straight) areas and solder all joints on curves. Then solder feeder wires to every new 'section of rail' as this will avoid any dependence on rail joiners to conduct current. It is a little more effort up front but will pay dramatic dividends in the long run.

Bill Carl (modeling Chessie and predecessors from 1973-1983)
Member of Four County Society of Model Engineers
NCE DCC Master
Visit the FCSME at www.FCSME.org
Modular railroading at its best!
If it has an X in it, it sucks! And yes, I just had my modeler's license renewed last week!

  • Member since
    September 2003
  • From: California - moved to North Carolina 2018
  • 4,422 posts
Posted by DSchmitt on Saturday, August 21, 2004 3:01 PM
I don't like to solder and find when I solder rail joiners I often end up with "cold" joints. They look good at first, but cause trouble latter[:(] Feeder wires are much easier to solder right[:)] Use flex track to minimize the number of joints and solder feeders to every section. If there must be a joint on a curve solder the joint with the track pieces together on the workbench and with them straight, then lay the whole section.

I tried to sell my two cents worth, but no one would give me a plug nickel for it.

I don't have a leg to stand on.

  • Member since
    June 2004
  • From: Pacific Northwest
  • 3,864 posts
Posted by Don Gibson on Saturday, August 21, 2004 3:43 PM
METAL RAIL JOINERS line up two ends of track. Since they are 'friction' fitted they will allow slippage or expansion. They also conduct electricity - when they're NEW.

SOLDERING is for Electrical connections and reliability. WHEN do we CROSSOVER? Thin rail joiners come under stress on curve alignment trying to hold two rails together. Soldering reinforces the joint

Soldering the rail joints to improve electrical continuity - but does so at the expense of expansion. Running trains does heat track, and track WILL expand - gaps or no.

To my esteamed colleague OrsonRoy, I find There are two schools on 'rail expansion':
1).Those that have had it happen, and 2). those who have not.

My club, The Columbia Gorge Model Railroad Club (Portland) 2 years ago built a large oblong SPIRAL in the summer to get from the main floor to the basement while maintaining a 2% grade. (Approx half the track joints (curved sections) were soldered). This winter we discovered our trains were derailing from a 3/4" open rail gap from contraction.

ANDY SPERANDEO suggested the best of both worlds. Words to the WISE i think.
Don Gibson .............. ________ _______ I I__()____||__| ||||| I / I ((|__|----------| | |||||||||| I ______ I // o--O O O O-----o o OO-------OO ###########################

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!