Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

New Track/Testing Project

761 views
3 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    October 2003
  • From: Milwaukee & Toronto
  • 929 posts
New Track/Testing Project
Posted by METRO on Sunday, May 30, 2004 9:23 PM
I have developed a new idea for one of my test tracks:

While we modelers do all we can to get the best trackwork we are able to there are still kinks and pops in most layouts. I have one where the flextrack joint is right as the line tops a steep grade, and it causes derailments and the worst times.

So my idea is thus: to better tune my rolling stock to be as smooth as possible in a variety of track conditions I have made a test track with the worst trackwork I can immagine. I went and pulled out my old brass code 86 section track dating from the late 70s and 80s, mixed several manufacturers and as I spiked it, I made sure to leave some gaps now and then. Also instead of just a simple oval this test track has lots of switches (in varying degrees of quality,) a side loop with 18inch radius, and a killer S-curve on a grade.

Since I put in this test track yesterday I've started improving the roll and electrical pickup of my fleet as well as some vast improvements on the settings and programing of my DCC!
  • Member since
    March 2016
  • 1,447 posts
Posted by Eriediamond on Monday, May 31, 2004 7:28 AM
Metro, Seems to me it would be less work and head aches to repair your bad track then to rework all your rolling stock to run on it. I may not be seeing the whole picture though.
  • Member since
    July 2003
  • From: Sierra Vista, Arizona
  • 13,757 posts
Posted by cacole on Monday, May 31, 2004 4:08 PM
We had a similar situation on a club layout when I first joined. It seems to me that a simpler solutiion for you would be to redo the flex track so that joint is not right at the top of the hill and causing a sudden transition, instead of having to rework all of your rolling stock.
  • Member since
    October 2003
  • From: Milwaukee & Toronto
  • 929 posts
Posted by METRO on Monday, May 31, 2004 9:18 PM
I have fixed lots of my trackwork, and I think it is actually quite good. But I also run my stock on some of my friends' layouts and some clubs so I have to have it ready for a variety of track qualities.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!