Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

DCC speed control

1705 views
9 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    August 2004
  • From: Amish country Tenn.
  • 10,027 posts
DCC speed control
Posted by loathar on Tuesday, April 8, 2008 10:32 PM
I'm using my Bach EZ system. If I'm running loco A @100% and loco B @ 50% (just to use numbers) When I switch the controller from A to B, loco B wants to jump up to 100% throttle when I touch the speed knob. (until I can turn it back down to 50%) Do the higher end DCC systems do this too, or is it just a quirk of the Bach system?
  • Member since
    November 2007
  • From: Southern California
  • 1,475 posts
Posted by New Haven I-5 on Tuesday, April 8, 2008 11:00 PM
 loathar wrote:
I'm using my Bach EZ system. If I'm running loco A @100% and loco B @ 50% (just to use numbers) When I switch the controller from A to B, loco B wants to jump up to 100% throttle when I touch the speed knob. (until I can turn it back down to 50%) Do the higher end DCC systems do this too, or is it just a quirk of the Bach system?
Must be a quirk. This doesn't happen when I double head 2 sound equipped locos mu-ed & not mu-ed on my Digitrax Zephyr.

- Luke

Modeling the Southern Pacific in the 1960's-1980's

Moderator
  • Member since
    June 2003
  • From: Northeast OH
  • 17,249 posts
Posted by tstage on Tuesday, April 8, 2008 11:16 PM

Tom,

I had forgotten about that one.  Yea, it's a E-Z Command thing.  The more sophisticated DCC systems won't do that.  The only exception to that might be the NCE Power Cab.

With the Power Cab, you can run two locomotives simultaneously and toggle between the two with no problems.  However, because the Power Cab has a recall stack limit of only two: If you add a third locomotive to the recall stack, the third locomotive will take the place of the prior locomotive you had in recall, as well as begin operating at whatever parameters (i.e. speed and direction) the prior locomotive was running at.

I only run two locomotives at a time with my Power Cab so this isn't an issue with me.  If I want to run a third locomotive, I just park one of the first two and enter the new address. 

Tom

https://tstage9.wixsite.com/nyc-modeling

Time...It marches on...without ever turning around to see if anyone is even keeping in step.

  • Member since
    July 2006
  • From: Vail, AZ
  • 1,943 posts
Posted by Vail and Southwestern RR on Tuesday, April 8, 2008 11:47 PM
I believe it would be more correct to say that it depends on the type of control the throttle has for speed.  If it uses up and down buttons, or an encoder, then this should not be a problem.  If it uses a potentiometer, it will be a problem.  NCE, for example, makes the "same" throttles both ways.

Jeff But it's a dry heat!

  • Member since
    July 2006
  • From: Austin, Texas
  • 875 posts
Posted by jasperofzeal on Wednesday, April 9, 2008 6:36 AM

 loathar wrote:
I'm using my Bach EZ system. If I'm running loco A @100% and loco B @ 50% (just to use numbers) When I switch the controller from A to B, loco B wants to jump up to 100% throttle when I touch the speed knob. (until I can turn it back down to 50%) Do the higher end DCC systems do this too, or is it just a quirk of the Bach system?

I was getting annoyed by that "feature" as well.  This is what I do now, I'll illustrate using your example.  If loco A is assigned to address 1, and loco B is assigned to address 2, I'll select another address like 3 for example, and pre-adjust the throttle according to which loco I'm going to select next.  I only used address 3 as an example, but you can use which ever one you want.  It all depends on how many locos you have on your layout at the same time that may be assigned to other addresses of the command station.

This process works for me on a large oval of track and a couple of sidings for when I'm "playing".  I don't know the size of your layout, but hopefully this method can be of service to you.

TONY

"If we never take the time, how can we ever have the time." - Merovingian (Matrix Reloaded)

  • Member since
    June 2004
  • From: Orig: Tyler Texas. Lived in seven countries, now live in Sundown, Louisiana
  • 25,640 posts
Posted by jeffrey-wimberly on Wednesday, April 9, 2008 7:49 AM
Thanks Tony, you beat me to it.Smile [:)]

Running Bear, Sundown, Louisiana
          Joined June, 2004

Dr. Frankendiesel aka Scott Running Bear
Space Mouse for president!
15 year veteran fire fighter
Collector of Apple //e's
Running Bear Enterprises
History Channel Club life member.
beatus homo qui invenit sapientiam


  • Member since
    June 2004
  • From: Orig: Tyler Texas. Lived in seven countries, now live in Sundown, Louisiana
  • 25,640 posts
Posted by jeffrey-wimberly on Wednesday, April 9, 2008 8:51 AM
Too bad he can't set those with his system. Maybe he has a nieghbor who has a better system.

Running Bear, Sundown, Louisiana
          Joined June, 2004

Dr. Frankendiesel aka Scott Running Bear
Space Mouse for president!
15 year veteran fire fighter
Collector of Apple //e's
Running Bear Enterprises
History Channel Club life member.
beatus homo qui invenit sapientiam


  • Member since
    October 2004
  • From: Colorful Colorado
  • 8,639 posts
Posted by Texas Zepher on Wednesday, April 9, 2008 10:55 AM
 loathar wrote:
I'm using my Bach EZ system. If I'm running loco A @100% and loco B @ 50% (just to use numbers) When I switch the controller from A to B, loco B wants to jump up to 100% throttle when I touch the speed knob. (until I can turn it back down to 50%) Do the higher end DCC systems do this too, or is it just a quirk of the Bach system?
I was going to suggest the same solution as the others have mentioned.  But thought I would mention that this is one big reason I am a firm believer in 1 loco, 1 throttle.   When two trains are controlled simultaniously by the same device, sooner or later the wrong train is sent the wrong command and ends up in an accident.   This is one reason I really liked the original MRC Command-2000 system.  It had three separate throttle levers for three separate trains, so there was no switching, scrolling, or alternating between anything.
  • Member since
    August 2004
  • From: Amish country Tenn.
  • 10,027 posts
Posted by loathar on Wednesday, April 9, 2008 11:26 AM
Thanks all! It's not really troublesome, more annoying than anything. I was wondering if I could expect the same quirk when I upgrade to a better system.
I hadn't thought about going to an unused address first.Dunce [D)]

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!