Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Mystery Railyard Structure

3707 views
17 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    January 2008
  • 595 posts
Mystery Railyard Structure
Posted by mreagant on Sunday, October 3, 2021 8:26 AM

I have a structure from a train show awhile back that was already built and I am uncertain what it was used for.  It's two vertical thanks elevated above ground on a rack. They funnel down with enough room for a truck to drive under for loading. No pics yet, but thought someone might recognize the description.

Mike

  • Member since
    September 2003
  • 21,669 posts
Posted by Overmod on Sunday, October 3, 2021 9:08 AM

One possibility would be part of a pressure-unloading system for bulk transfer: grain, or powder, or resins, etc. are blown from a covered hopper car up into the cylindrical hoppers; they then feed by gravity into trucks beneath 'as needed'.  

These could be loaded from the ground via one of those conveyor loaders, making it easy for trucks to load materials stored in piles without the rigmarole of lifting the stuff up into the truck and arranging to distribute it from edge to center...

  • Member since
    June 2014
  • From: Ohio
  • 231 posts
Posted by josephbw on Sunday, October 3, 2021 9:11 AM

It sounds like one I built about 40 years ago. It was used at a sawmill to catch the sawdust. Then a RR car would take the sawdust to a paper mill. That's the best I can do from your description.

Joe

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Sunday, October 3, 2021 11:57 AM

Without a picture, it's a guessing game.

How about a sanding facility?

Mike.

  • Member since
    May 2004
  • 7,500 posts
Posted by 7j43k on Sunday, October 3, 2021 12:05 PM

Something like this?:

 

 

 

Ed

  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Sunday, October 3, 2021 1:09 PM

Possibilities:

A sanding facility

Ammonium Nitrate prills (beaded fertilizer in commercial volumes)

Sawdust (mentioned above)

Potash

Cement

Lime

Plastic beads of a kind used nearby in forming

and many others...

  • Member since
    September 2003
  • 21,669 posts
Posted by Overmod on Sunday, October 3, 2021 1:31 PM

Ed's facility, if that's the structure the OP has, is interesting.

Don't be fooled by modelers sticking a random transit-mix truck underneath into thinking this is a concrete plant -- see the vents up top and the transfer pipes?  This is for dry materials.

You could use this for certain types of transit-mix, by metering the dry materials into a cenent-mixer and adding the appropriate charge of water 'down below' -- or have only dry aggregate components in the hoppers to be added to cement and water paste loaded in at a different location.

Schwarz Baustoff-Logistik is an actual 'thing' (a company dealing in dry building materials) but I wouldn't wish their website on a dog, so here is a representative 'other firm':

https://www.baustoff-logistik-suedharz.de/

Note the range of material they specialize in providing.  Some of those are options for this sort of double-hopper facility...

  • Member since
    January 2008
  • 595 posts
Posted by mreagant on Sunday, October 3, 2021 2:04 PM

The one in the model box is it. I thought it might be associated with a sanding process. Would it have an open sand bunker nearby?

  • Member since
    May 2004
  • 7,500 posts
Posted by 7j43k on Sunday, October 3, 2021 2:17 PM

Don't think sand, except for maybe street-sanding for winter.

Maybe special chemical additives to a concrete mix.

 

Ed

  • Member since
    January 2008
  • 595 posts
Posted by mreagant on Sunday, October 3, 2021 6:03 PM

Well, I don't have a place for that kind of facility so looks like I've got to be creative.

  • Member since
    January 2017
  • From: Southern Florida Gulf Coast
  • 18,255 posts
Posted by SeeYou190 on Sunday, October 3, 2021 10:49 PM

Overmod
Don't be fooled by modelers sticking a random transit-mix truck underneath into thinking this is a concrete plant -- see the vents up top and the transfer pipes?  This is for dry materials.

At every cement plant I have been in, the product is dry when the trucks are loaded.

Dry material is loaded first, then the water is added, the chemical reaction starts, and the truck leaves the lot. Water is never added until the truck is ready to go to the customer.

All materials are dry in the plant until they are in the mixing drum on the truck.

-Kevin

Living the dream.

  • Member since
    September 2003
  • From: California - moved to North Carolina 2018
  • 4,422 posts
Posted by DSchmitt on Sunday, October 3, 2021 11:50 PM

Doppelsilo  is double silo in English - which is what it is

Schwarz-Bau is black construction which the references I found say refers to an  illegal building

However

Found the kit at several on-line stores.  They call it a concrete silo owned by the Schwarz Concrete Works  - so it translates to Schwarz Construction (company).

I tried to sell my two cents worth, but no one would give me a plug nickel for it.

I don't have a leg to stand on.

  • Member since
    August 2003
  • From: Collinwood, Ohio, USA
  • 16,367 posts
Posted by gmpullman on Monday, October 4, 2021 1:04 AM

I'm planning a sanding tower based on a photo here:

 Sand tower by Edmund, on Flickr

I found another photo of a similar tower on the Erie which has two silos.

 

 Fuel_May_EL-2 by Edmund, on Flickr

 Fuel_May_EL-1 by Edmund, on Flickr

Thank you, Ed

  • Member since
    January 2008
  • 595 posts
Posted by mreagant on Monday, October 4, 2021 9:37 AM

Photos really helped. I may modify it for a sanding structure.

Mike

 

  • Member since
    September 2003
  • 21,669 posts
Posted by Overmod on Tuesday, October 5, 2021 10:57 AM

DSchmitt
Schwarz-Bau is black construction which the references I found say refers to an  illegal building

Schwarz (u. Sohne, I believe) is the name of the building materials company.  'Baustoff' (one word) is dry building material, including what we call 'dirt' in the United States, 'logistik' is the same sense of planning and delivery that 'logistics' implies.

If your example is set up like the version on the catalog, it is specifically intended to MIX material from the hoppers in some proportion -- I suspect this would be sand in one and larger aggregate in the other, whether for transit mix or transport to on-site mixing.  It's possible that one would be cement and the other sand, but that would pose something of a caustic dust problem and terrible rain difficulties 'as shown'...

  • Member since
    September 2003
  • 21,669 posts
Posted by Overmod on Tuesday, October 5, 2021 11:05 AM

SeeYou190
At every cement plant I have been in, the product is dry when the trucks are loaded.

But in every "cement" plant I have seen, or designed, the water is added in process, with supply and treatment and temperature controlled and assured at mix time.  There is no water, or provision for it, anywhere in that structure.

I have certainly seen transit-mix trucks with water reservoirs (looking a bit like Elesco feedwater heaters!) and those could certainly be used to get the paste started, with aging in the truck.  I kinda ASSumed those were primarily for washout after delivery in remote sites with no water or water trucks available.

  • Member since
    March 2013
  • 427 posts
Posted by Colorado Ray on Tuesday, October 5, 2021 8:34 PM

Overmod

 

 
SeeYou190
At every cement plant I have been in, the product is dry when the trucks are loaded.

 

But in every "cement" plant I have seen, or designed, the water is added in process, with supply and treatment and temperature controlled and assured at mix time.  There is no water, or provision for it, anywhere in that structure.

 

I have certainly seen transit-mix trucks with water reservoirs (looking a bit like Elesco feedwater heaters!) and those could certainly be used to get the paste started, with aging in the truck.  I kinda ASSumed those were primarily for washout after delivery in remote sites with no water or water trucks available.

 

 

The ultimate strength of concrete is a function of the water to cement ratio.  Too wet and the concrete won't meet specifications.  The field measurement is referred to as "slump".  The wetter the mix, the higher the slump.  If a truck is delivered with a slump that is too high, the entire truck is rejected. Therefore, it's common to leave the plant with a little less water and add the final amount at the job site.  Hence the water supply on the truck.  

Since high slump concrete is easier to place, it's a constant battle with the operators to not put too much water in the mix on site.

Ray

 

 

  • Member since
    September 2002
  • 7,486 posts
Posted by ndbprr on Wednesday, October 6, 2021 7:58 AM

Since this is from a Europeon source it would be nice to have had a Europeon knowledgeable source comment.  There is no question in my.mind that the cement truck goes with the tower since they are in the same gaudy colors. This appears to be a train set level building not a serious detailed structure.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!