Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Rail Welding and Modern Railroading

2425 views
10 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    June 2001
  • From: Anderson Indiana
  • 1,301 posts
Rail Welding and Modern Railroading
Posted by rogerhensley on Sunday, September 24, 2017 6:27 AM

Q) How do railroads weld the continuously welded rail when they change out a section of track like at a crossing?

 A) I expect that there are various ways, but a few  summers ago I watched a Conrail crew of two "welding" rail joints on a section of track that was to become a new crossing on a nearby street.  I use the term "welding" loosely. They have a small furnace that they place over the joint. This will heat the metal and let it pour into the joint. Then they clean up the joint and move on to the next joint.
 
The track sections were brought in already fastened to the ties and were joined together on the spot by this crew.  Several days later another crew came through and ripped out the old crossing, picked up the newly assembled "Snap Track" section with a crane, dropped it into place, welded it to the main and were ready to pave the crossing.
This took three or four days instead of the weeks that it used to take.  It took less people with more mechanization. 
 
Now, I have noticed more and more reports of US railroads using or beginning to make use of concrete ties as replacements for the old standby, the creosoted or pressurized wooden tie.  BART (Bay Area Rapid Transit) in San Francisco rides on concrete pads and supports.  Less rail alignment problems they say. However, this hasn't proven to be the complete answer for the freight railroads that is was hoped to be. A heavily loaded derailed freight car can easily destroy all of the concrete ties that it is dragged over. But still, there are many places for their use and they are seeing increased service there.
 
Our railroads are changing to meet future maintenance and transportation needs (they always did, but we sometimes didn't notice).  We have all seen things that haven't registered at the time.  We have seen things that brought out a "Wow" from us as we saw them.  I watch the new 4,000 plus hp GE wide cab units blow by and I'm impressed.  But the new techniques to lay and repair the track that they ride on is just as impressive.
 
As modelers, our mouths may water at the sight of that new high power loco by Athearn or Kato, and we can easily visualize it pulling our consists down our mains. But what about the MOW men and equipment?  Isn't there a place for them on our railroads, as well?  How about a welding crew working on that 'Snap Track' section as the INEL moves by under a Slow Order? Or when you are adding a new section of railroad, have a crane crew with a section of track waiting to be put into place. We can follow the prototype even as we operate our trains.
 
Roger Hensley
 

Roger Hensley
= ECI Railroad - http://madisonrails.railfan.net/eci/eci_new.html =
= Railroads of Madison County - http://madisonrails.railfan.net/

  • Member since
    September 2003
  • From: Omaha, NE
  • 10,614 posts
Posted by dehusman on Sunday, September 24, 2017 7:29 AM

They are welding a joint, but that's not how railroads make continuous welded rail.

CWR is made in plants where 39 or 78 or a thousand foot sections of rail are eltrically butt welded together.  A fixture clamps each section of the rail and then compresses the rail ends together while high voltage is fed through the joint. That heats the joint hot enough to melt the steel and fuse the rails together.  A shear cuts off the overflowed metal from the weld and the joint is ground smooth.

The thermal weld being shown is for field repairs or for joining sections of CWR together.  They are generally of lower quality than an electric weld.  The railroads also lease portable electric butt welders that lower an electric butt welding rig onto the joint and make a near factory electric weld .  They are normally housed in a hi-rail truck that is a 15-20 foot box truck. 

Dave H. Painted side goes up. My website : wnbranch.com

  • Member since
    March 2002
  • From: Milwaukee WI (Fox Point)
  • 11,426 posts
Posted by dknelson on Sunday, September 24, 2017 10:50 AM

Those on-site thermal welds usually leave some debris behand, including a reddish substance almost like lava rock.  And chalked in data about the weld on the side of the rail.  Details that could be modeled.

Dave Nelson

  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Sunday, September 24, 2017 1:43 PM

 Those field welds use thermite in those pots. There's a good video on YoouTube that shows the whole process, clamping the form on, and the pot, then lighting it off, then knocking the form off, chipping off the excess, and then bringing in a rail grinder to smooth it all out.

                         --Randy

 


Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

  • Member since
    March 2015
  • 1,358 posts
Posted by SouthPenn on Thursday, September 28, 2017 9:52 AM

How do you move a thousand feet of track from the factory to where it's needed?

South Penn
  • Member since
    November 2006
  • From: Northeast
  • 746 posts
Posted by GraniteRailroader on Thursday, September 28, 2017 10:13 AM

Specialized flat cars with racks. The rail is "flexible" enough that it can be carried full length with no issues.

This space reserved for SpaceMouse's future presidential candidacy advertisements

  • Member since
    March 2003
  • From: Central Iowa
  • 6,825 posts
Posted by jeffhergert on Thursday, September 28, 2017 11:23 AM

Video of a rail train laying rail.

https://www.youtube.com/watch?v=5xxVD2L_veM 

Jeff

  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Thursday, September 28, 2017 11:27 AM

Here's a westbound train of welded rail at Enon Valley, PA....

Wayne

  • Member since
    August 2003
  • From: Collinwood, Ohio, USA
  • 16,225 posts
Posted by gmpullman on Thursday, September 28, 2017 11:45 AM

Faller makes an LED lighted thermite pot:

http://www.modeltrainstuff.com/product-p/flr-180664.htm

Don't set your ties on fire!

Have Fun, Ed

  • Member since
    July 2009
  • From: lavale, md
  • 4,640 posts
Posted by gregc on Thursday, September 28, 2017 4:24 PM

how do they deal with expansion during the summer?

greg - Philadelphia & Reading / Reading

  • Member since
    September 2003
  • From: California - moved to North Carolina 2018
  • 4,422 posts
Posted by DSchmitt on Thursday, September 28, 2017 7:36 PM

[quote user="gregc"]

This Wilipedia article answers your question.

https://en.wikipedia.org/wiki/Track_(rail_transport)#Continuous_welded_rail

Basically the rail is placed when the temperature is midway between the extremes for the area.

It is constrained from longutudional expansion and contraction by the track structure forcing the rail to expand and contract in height and width not length.

The change in length will actually be less than for the same distance laid with jointed rail.

 

I tried to sell my two cents worth, but no one would give me a plug nickel for it.

I don't have a leg to stand on.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!