Login
or
Register
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Home
»
Model Railroader
»
Forums
»
Layouts and layout building
»
BAH R.R. tour - photo intense
Edit topic
Updated your discussion topic below.
Subject
Enter a subject for your topic. Maximum 150 characters.
Post Body
Enter your post below.
<P>This is a continuation/update from the following thread:</P> <P><A href="/TRC/CS/forums/885598/ShowPost.aspx">http://www.trains.com/TRC/CS/forums/885598/ShowPost.aspx</A></P> <P>All of the track is now in for the BAH R.R. Things are still a little messy; however it is fully operational.<BR>This photo tour shows the "complete" BAH R.R. as of today.</P> <P><BR>Between is being leveled in place in the layout:<BR>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/090406-001_r.jpg[/IMG]<BR>Trackwork and mine in Between:<BR>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/090406-012_r.jpg[/IMG]<BR>First empty ore cars being spotted in Between:<BR>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/090406-013_r.jpg[/IMG]<BR>The other major mine is the one in Arock:<BR>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/090406-015_r.jpg[/IMG]<BR>Overall views of the complete BAH R.R.<BR>This is Arock over Hardspot (24" real world difference):<BR>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/090406-016_r.jpg[/IMG]<BR>Both towns take a turn to the right (12" shelf portion of layout) for the town leadins (Station in Hardspot):<BR>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/090406-017_r.jpg[/IMG]<BR>The rest of the wall (shelf side):<BR>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/090406-018_r.jpg[/IMG]<BR>To get from Hardspot to Arock; a 96' climbing loop is used. This will be a pair of mountains with a low level continuous run loop at the lowest level (another 33' of track).<BR>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/090406-019_r.jpg[/IMG]<BR>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/090406-021_r.jpg[/IMG]</P> <P>The layout has 34 turnouts and 300' of track in a 75" x 178" room. Hardspot, Arock and Between are all level. The continuous run loop drops 3" away from Hardspot (halfway through the loop). The three climbing loops between Arock and Hardspot are about 30' long each with a average (continuous) grade of just sightly over 2 %.</P> <P>Time period is early 20th Century Silver Mining in Colorado (no automobiles or diesels). Small steam with short trains is the norm.</P> <P>Trial runs indicate that it takes 6 minutes (actual) to get to Arock from Hardspot. Running a train between the two, turning everything around, running back down, and then turning everything around (ready for the next trip) takes an actual 40 minutes. There is a LOT of operating in this small layout.<BR>Thanks for looking; I will keep you posted on scenery and detail work. Thanks to all of you that gave input during the design stages (your input really helped).<BR>Comments?<BR></P>
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
E-mail Subscribe
Check the box below if you want to receive e-mail notifications when replies are made to this thread.
Receive notifications
Update Discussion Topic
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Users Online
There are no community member online
Search the Community
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter
See all
Sign up for our FREE e-newsletter
and get model railroad news in your inbox!
Sign up