Modeling the Reading Railroad in the 1950's
Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.
Marlon
See pictures of the Clinton-Golden Valley RR
QUOTE: Originally posted by rrinker Sure you didn't mis-type there? 51% humidity, I would LOVE for it to be only 51%... we've been running 90-95 degrees and 70-70% right now, that's like walking into a steam room when you step outside, before even TRYING to do any work. It's those kind of days where you look out and even the kids aren't outside playing. They wait til after dinner when it cools off a bit. So does the yard work. Guess I'm too cheap for sod - slowly but surely the damage from the pervious owner's neglect is being repaired - scratch up a section apply some topsoil, seed, and wait. --Randy
QUOTE: Originally posted by Medina1128 I like Woodland Scenics better for putting in grass... a little diluted white glue, an old Parmesan cheese shaker and I'm done.
QUOTE: Originally posted by pcarrell rrinker, You must live near me in central Indiana. It's been 85-90 degrees and about the same in humidity for days now! [:0] Jarrell, Look at it this way,....pretty soon you won't be able to work on your new 1:1 layout. It'll be too cold and you'll be "forced" to play with the little one! [:D][:D][:D][:D]
QUOTE: Originally posted by Overdurff Sounds like it's time to throw in the towel and take up garden rail roading. The CFO may "see" the light and insist you go to the airconditioning and play with your trains!! Will
QUOTE: Originally posted by pcarrell rrinker, You must live near me in central Indiana. It's been 85-90 degrees and about the same in humidity for days now! [:0]