on Tuesday, December 20, 2005 6:50 PM
I have been reading for years, but working pretty hard on the layout and plans for the last year. I think I know at least 1% of what I need to know to build my dream.
N Gauge - Totally freelance
Time period 1920-Present; Manhattan will be fall, Colorado will be winter and Wichita will be summer.
I plan to build it in 5 phases. I hope to get each phase pretty well done so hopefully I can learn from my mistakes.
Right now I am totally a "Railfan." I basically want to model and watch the trains run. But I want to build it with "Operation" in mind for the day when I am finally done building.
Purpose of the line is to take coal from a Colorado mine to a power plant in Kansas.
Route: From the coal mine I want to go over the biggest/tallest trestle I can fit in that space. I will then catch the second level of the helix and go to the bottom. After a loop around the base of the mountains, I want to go through "Colorado City." This will be an industrial town, dirty, with "some vices." Then the will enter heaven as it travels through Wichita and Newton. It will have to go under the mountain and through Manhattan, past KSU Stadium (now called Bill Snyder Family Stadium) to the power plant. I plan to have a hidden track from the power plant back to the coal mine.
I like my overall layout plan, but the detail track plan is more difficult. Here is what I have at this point.
[
The double line main track will be above the yard track. This is the way it really is in Wichita. Just after the farm the lines diverge. I plan to gain the main line an inch and lower the industrial line an inch to get clearance. I have been struggling with the yard/staging area. I am not happy about how to get there or the layout. The track in the middle represents the AVI, Ark Valley Interurban. It was an electric line that started in the late teens and lasted into the 1930's. It had a station stop at grandpa's farm where he would put the 5 gal cans of milk on the train to go to the processing plant.
Please give me some critical thoughts. Thanks
Reply
Edit
ericboone
Member since
January 2002
From: Minnesota
659 posts
Posted by
ericboone
on Tuesday, December 20, 2005 9:57 PM
Wolfcat,
Looking at your layout verses room, it seems that you’re not using the layout space very efficiently. I don't know if there are any windows to deal with on the top wall (were the electrical box is), but why is the aisle there other than for access to the electrical box? If you pushed the layout against the top wall, leaving the layout very thin or using a narrow removable section for easy access to the electrical box, then the center peninsula and the portion of the layout on the right wall will all be 2 feet longer. You could also place the left peninsula (labeled Manhattan) against the top wall, going into the area you’ve labeled as a work area, and put the work area were Manhattan was. This will eliminate the swing bridge to your work area, which will get annoying very quickly. Also, it seems you would have more layout room that way.
Eric
Reply
Anonymous
Member since
April 2003
305,205 posts
Posted by
Anonymous
on Wednesday, December 21, 2005 11:37 AM
Thanks for your thoughts. I plan the workarea for the back area just to make it less visable. I would rather see the layout than the workarea. Also, the swinging bridge won't be built until Phase 4 so I won't have to worry about it for quite some time. The sewer cleanout is also there with the elect box. I have an outside cleanout that I am trying to find under the grass so that won't be an issue. I would like that extra length to the top wall. I will have to think about that plan.
I like this better. It adds several square feet. I can always duck under to get to the electrical box.
Thanks
Reply
Edit
ereimer
Member since
June 2003
From: CANADA
2,292 posts
Posted by
ereimer
on Wednesday, December 21, 2005 11:11 PM
before you build anything in front of your electrical box be sure to check your local building code to see if it's allowed
Reply
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Users Online
ATLANTIC CENTRAL
see all »
Search the Community
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter
See all
Sign up for our FREE e-newsletter
and get model railroad news in your inbox!
Sign up