Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Tortoise machines installed upside down?

1359 views
5 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    April 2003
  • 305,205 posts
Tortoise machines installed upside down?
Posted by Anonymous on Thursday, January 13, 2005 7:17 PM
Has anyone experimented with installing Tortoise machines on top of a layout? I have a clearance problem underneath and I believe I could hide the machines behind a building. Any thoughts on the matter? [:D]

Roger W.
  • Member since
    August 2004
  • From: Eastern Nebraska
  • 166 posts
Posted by SP4449 on Thursday, January 13, 2005 9:10 PM
The Tortoise will work in almost any position. Upside down is not a problem since there are no parts inside that have to be in a particular orientation for proper operation. The thing you need to worry about is whether the throw wire can move the turnout points and it swings in a plane that parallels the surface of the Tortoise that the throw link comes out of.
  • Member since
    November 2003
  • From: Michigan
  • 227 posts
Posted by SteelMonsters on Thursday, January 13, 2005 9:26 PM
I've seen a layout with staging so close to the surface deck, tortoises couldn't be mounted under the table. What was done is a grove was made in the homosote and a brass tube placed in there. The tubes extended from the turnouts to a couple of buildings. Inside each tube was piano wire connected to the turnout and on the other end connected to the tortoise. The tortoises were mounted upsidedown. The regular piano wire was in place as it would in the "normal" position except it did not go through the plywood. The wire from the turnout's end was formed into a loop which the tortoise wire fit in.

I've seen simular things done with hand throws too.
-Marc
  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Thursday, January 13, 2005 9:42 PM
I will probably have to do that for my staging yard as well. Normally I mount them IN the benchwork - I use 2" extruded foam. Mounting them from the top makes only an inch or so stick out underneath, plenty of room to solder but all surrounded by a cocoon of foam [:D].

--Randy

Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

  • Member since
    January 2004
  • From: Crosby, Texas
  • 3,660 posts
Posted by cwclark on Friday, January 14, 2005 1:38 PM
there was an article in last year's MR mag. that explained how to mount them above the table...which issue?..i don't know... but it was in one from last year...chuck

  • Member since
    August 2004
  • From: Eastern Nebraska
  • 166 posts
Posted by SP4449 on Wednesday, January 19, 2005 9:22 PM
The article about mounting the tortoise switch machine above the layout, appeared in the August 2004 MR magazine, page 28. Pictures are included.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!