Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

10 gauge wire

1960 views
9 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    February 2020
  • 70 posts
10 gauge wire
Posted by Llenroc fan on Monday, June 8, 2020 9:16 AM

I have two spools of 10 gauge wire that I picked up at a flea market 10 years or so ago.  Each must have 100' on it.  Would it be total overkill to use as bus wire or would it be better put to some other purpose?

  • Member since
    April 2003
  • From: Clinton, MO, US
  • 4,261 posts
Posted by Medina1128 on Monday, June 8, 2020 9:35 AM

A lot of that will depend on the size of your layout. I used 10 ga wire as busses on my layout, as it's 27'x29'. 

  • Member since
    August 2013
  • From: Richmond, VA
  • 1,890 posts
Posted by carl425 on Monday, June 8, 2020 10:13 AM

The biggest downside will be soldering feeders to it.  It takes lots of watts to heat up 10 ga to the point solder will melt.

I have the right to remain silent.  By posting here I have given up that right and accept that anything I say can and will be used as evidence to critique me.

  • Member since
    January 2017
  • From: Southern Florida Gulf Coast
  • 18,255 posts
Posted by SeeYou190 on Monday, June 8, 2020 10:18 AM

I used 10 gauge bus (DC operation) on my last four layouts. It is not that expensive, and never has problems. I do not believe overkill is a bad thing. I do tend to overbuild everything.

It does take a high wattage iron. I have one just for that duty. My picture shows 14 gauge wire on a layout experiment segment.

-Kevin

Living the dream.

  • Member since
    January 2014
  • 1,500 posts
Posted by ROBERT PETRICK on Monday, June 8, 2020 10:51 AM

carl425

The biggest downside will be soldering feeders to it.  It takes lots of watts to heat up 10 ga to the point solder will melt.

Yes. I had the same issues.

And going the suitcase connector route will be problematic as well. Those connectors have a range of sizes for the larger wire and the smaller wire, and I think the smaller wire for the 10 gauge connector would be about 16 gauge, too large for feeders.

10 gauge is doable, and cost effective if you have some on hand, and the feeder connection issues aren't all that bad.

Wishy washy advice. Sorry. Embarrassed

Robert 

LINK to SNSR Blog


  • Member since
    July 2006
  • From: 4610 Metre's North of the Fortyninth on the left coast of Canada
  • 9,352 posts
Posted by BATMAN on Monday, June 8, 2020 12:09 PM

I used 12g because when I went to buy 14g at the industrial electric place the guy wanted to empty two massive spools and re-hang two new ones. I ended up getting 300' of black and 300' of green for a fraction of what he was going to charge me for the 14g. I would be fine with using 10g and I have had no problems soldering to 12g.

Brent

"All of the world's problems are the result of the difference between how we think and how the world works."

  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Monday, June 8, 2020 1:20 PM

Llenroc fan

I have two spools of 10 gauge wire that I picked up at a flea market 10 years or so ago.  Each must have 100' on it.  Would it be total overkill to use as bus wire or would it be better put to some other purpose?

 

If you have it, I don't see a major reason not to make use of it.  The soldering problem is one negative factor, and so is the ease of shaping it and running it around corners of the layout.  But at least once it's shaped, that's it.  Voltage drop, on the other hand, will be minimal over dozens of feet.

  • Member since
    June 2014
  • From: East Central Florida
  • 480 posts
Posted by Onewolf on Monday, June 8, 2020 4:09 PM
Stranded or solid? 10GA solid will be a little stiff to work with. I use 10GA stranded on my layout because I have some fairly long bus runs.

Modeling an HO gauge freelance version of the Union Pacific Oregon Short Line and the Utah Railway around 1957 in a world where Pirates from the Great Salt Lake founded Ogden, UT.

- Photo album of layout construction -

  • Member since
    March 2015
  • 1,358 posts
Posted by SouthPenn on Monday, June 8, 2020 4:29 PM

I used the terminal strip shown below. Ran parallel #16 wire from one terminal strip to the next. Then used #20 gauge from the terminal strip to the track. No soldering except at the track. It would be great for #10 wire.

12-Point.jpg

 

South Penn
  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Wednesday, June 10, 2020 7:53 AM

 Wire already owned is never overkill.

Even if you only have a 15 foot bus run. If you had no wire on hand - buying #10 is overkill for that. But since you already HAVE the #10 - no sense not using it. 

                                         --Randy

 


Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!