Rob Spangler
Modeling the Reading Railroad in the 1950's
Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.
QUOTE: Originally posted by rrinker Consider a helix. Take those two 36" radius curves you have and make many more, stacked on top of one another. With an HO typical 4" separation between levels, that will be a less than 2% grade. Just about anything will work on that grade. --Randy
Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
QUOTE: Originally posted by joecool1212 I thought about a helix but trying to hide it would be impossible. It would have to go on top of the layout. Cant go in a corner of the room(its the walkway). Has anyone tried to hide it in a big mountain?