Laying Campbell Shingles

6651 views
23 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2015
  • From: Shenandoah Valley
  • 9,094 posts
Laying Campbell Shingles
Posted by BigDaddy on Wednesday, May 2, 2018 8:59 PM

I am building a Details Associate Roundhouse and it came with Campbell's shingles.  The picture of the roof, is deceiving, and taking my own pictures did not help.  It looks like a simple trapezoid. 

It is not, nor is it a gentle curve.  Each roof above each stall is a trapezoid in a separate plane from the next roof segment.

A strip of shingles cannot simply curve around, they have to change angles at every section (3) of roof.

My instinct is to start on the middle section, hard to explain why, but I think it might be easier to get the angle where they meet to look right.  Is that right or should I start on the end and work my way right to left?

 

 
 
 
 

Henry

COB Potomac & Northern

Shenandoah Valley

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Wednesday, May 2, 2018 9:16 PM

I've never done a round house roof, but pictures I've seen on a search, show each section, handled as a seperate roof, with a typical roof "valley" between each section.  The back side would be a typical roof "ridge".

I wouldn't think it would matter where you started.

Mike.

  • Member since
    January 2009
  • From: Bakersfield, CA 93308
  • 6,526 posts
Posted by RR_Mel on Wednesday, May 2, 2018 10:17 PM

I’ve been using Campbell shingles for over 40 years and they are curveable.  I don’t use straight water to wet the shingle strips, I use Arleen’s Wood Glue as the adhesive.  Be extra carful and don’t get any glue on the surface of the shingles if you are planning to stain them, the glue won’t take the stain.  Don’t saturate the shingles or the card stock because it can take 24 hours to dry and it will warp.
 
There isn’t a better scale shingle roof than a Campbell shake roof.   
 
Mel
 
Modeling the early to mid 1950s SP in HO scale since 1951
  
 
My Model Railroad   
 
Bakersfield, California
 
I'm beginning to realize that aging is not for wimps.
 
  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Wednesday, May 2, 2018 10:41 PM

The best place to start is at the bottom. Smile, Wink & Grin

Mike's suggestion to use valleys between segments is prototypical, and solves the problem of the angles created by the shape of the roof segments.
I'd do the middle section first, since it's the only one where each course will need to be pre-cut to length.  The outer sections can be cut a little longer than needed, then trimmed after all shingles are in place.

I used Campbell shingles on several structures, but since all of them were styrene, didn't use the pre-gummed feature.  Instead, I cut all of the slightly oversize strips needed for the entire roof, then brushed-on gelled contact cement, being very careful to keep the strips from coming in contact with one another.
The roof was then given a quick brushed-on coating of lacquer thinner to "prep" the styrene (this keeps the styrene from drawing too much solvent out of the contact cement, and allows the brushed-on cement to go on much more smoothly).  After the contact cement had dried for the specified time, it was quick and easy work to add the shingles. After all were in place, I used a sharp blade to trim-off the excess at the gable ends...

Wayne

  • Member since
    December 2015
  • From: Shenandoah Valley
  • 9,094 posts
Posted by BigDaddy on Thursday, May 3, 2018 12:00 PM

Thanks guys, great pics as always Wayne.

Mel are you working with styrene as the reason to use glue?

 

Henry

COB Potomac & Northern

Shenandoah Valley

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Thursday, May 3, 2018 12:53 PM

BigDaddy
A strip of shingles cannot simply curve around, they have to change angles at every section (3) of roof.

Nevermind--brainfart.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    January 2009
  • From: Bakersfield, CA 93308
  • 6,526 posts
Posted by RR_Mel on Thursday, May 3, 2018 1:33 PM

Henry
 
It’s been so long since I stopped using the stickum on the back of the shingle strip that I can’t remember why I do it that way.  I do know it works great for me.  I have used the Campbell shingles on styrene and that works good too.
 
I bought a couple of Walthers Plastic Passenger platforms and used the Campbell shingles to match my 20 year old station.
 
 
 
 
 
Mel
 
Modeling the early to mid 1950s SP in HO scale since 1951
  
 
My Model Railroad   
 
Bakersfield, California
 
I'm beginning to realize that aging is not for wimps.
 
  • Member since
    November 2016
  • 476 posts
Posted by j. c. on Thursday, May 3, 2018 2:01 PM

i no longer use the campbell shingles but when i did i used krylon spray adhesive ,a word of caution  upon moving over to styreen from wood  i found it would some times warp the roof. i now use B.E.S.T. shingles.  

  • Member since
    July 2006
  • From: west coast
  • 7,667 posts
Posted by rrebell on Saturday, May 5, 2018 3:49 AM

Campbell shingles are great. I use plain white glue and never had a problem with alcohol stains for finishing. You can curve the Campbell shingles. For the top ridge I use strip wood, just looks better to me than laying on single shingles as they end up being too thick.

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Sunday, May 6, 2018 8:33 AM

BigDaddy
My instinct is to start on the middle section, hard to explain why, but I think it might be easier to get the angle where they meet to look right.  Is that right or should I start on the end and work my way right to left?

Actually I would do neither. 

In the real world, using roll shingles as you are doing, you would weave them, overlapping first one side then the other. 

Here, I would lay the first row along the bottom of the center running a little long on both sides. Then do the outsides running long over the valley.  Now complete both side sections before coming back to the center. Then I would lay the center section. Now when you cut the angles, there will be no gap, and no tell-tale modelers cut line.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    December 2015
  • From: Shenandoah Valley
  • 9,094 posts
Posted by BigDaddy on Saturday, April 20, 2019 7:50 AM

The roof got delayed because of the roundhouse track work, which was delayed because of turntable electrical issues, which.....

I brought the chimneys upstairs, still in their package, so I could cut them off the sprues and paint them a flat black and they disappeared off the kitchen table.

Until they turn up there is still plenty of roof to do.  A pair of straight iris scissors and curved tweezers are invaluable. 

The shingles are curved, because of the cuts in one end to make the shingles, that edge is longer than the uncut edge.  As soon as you start laying a strip down, the end wants to go up.  I takes a little practice to deal with that.

Wayne how did you do the top ridge?  This is Wayne's building from earlier in this thread, not mine.

 

Henry

COB Potomac & Northern

Shenandoah Valley

  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Saturday, April 20, 2019 1:17 PM

BigDaddy
...how did you do the top ridge?...

Since I couldn't remember, I took a closer look and discovered it to be not very prototypically correct. Embarrassed
 
As near as I can tell, it looks as if I likely cut a full-length strip of shingle material, then coated the entire back of it with the gelled contact cement, also coating the ridge area in the same manner.

Once the cement had dried for the appropriate amount of time, I used a sharp blade to remove the plain, non-shingle area of the strip, leaving the individual shingles more-or-less held together by the contact cement.
 
I don't recall how I managed to apply them as accurately as they appear, with half of the shingles' length on one side of the ridge and the other half folded-over onto the other side, but here's a close-up view of the ridge, taken a few minutes ago, showing the unprototypical job, which hopefully won't be so noticeable once the structure is in-place on the layout....

(For shingling the main areas of the roof, the contact cement was applied only to the styrene roof and to the entire back-side of the shingle strips - no cement was applied to the exposed portion of the shingle strips that would be covered by the application of subsequent strips - in other words, the shingles on the roof's surface are cemented only to the roof, not to the portion of the strips over which they're applied.)

Wayne

  • Member since
    December 2015
  • From: Shenandoah Valley
  • 9,094 posts
Posted by BigDaddy on Saturday, April 20, 2019 6:37 PM

Thanks Wayne, somehow contact cement isn't on my go to list.

I don't live in an area where we have these kind of roofs so I'm not sure what prototypical really looks like, but your looks good enough to view from 3' away.

Anyone else have any ideas about the ridge cap?

My chimneys turned up, they were in a pill bottle so easily lost among other pill bottles that contain KD coupler springs and, of all things, pills.

Henry

COB Potomac & Northern

Shenandoah Valley

  • Member since
    January 2009
  • From: Bakersfield, CA 93308
  • 6,526 posts
Posted by RR_Mel on Saturday, April 20, 2019 7:07 PM

I believe the Campbell shingles are made from the same type material as standard brown 2” packing tape.  I make my roof caps from 2” brown tape, I cut it on my workbench cutting mat using a ruler as a straight edge and a sharp #11 blade.  For my HO structures I cut it 3/16” wide and fold it down the middle.  It’s easier to fold it after moistening them.  I use Aleene’s Wood Glue to glue the shingles on the roof.
 
After the shingles have totally dried I use a small hobby wire brush to score the shingles with a downward motion.  That puts a natural grain in the shingles and helps them to accept a stain.
 
I’ve been doing it that way for about 40 years.
 
 
Mel
 
 
My Model Railroad   
 
Bakersfield, California
 
I'm beginning to realize that aging is not for wimps.
 
  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Saturday, April 20, 2019 7:17 PM

I have read, in the past, that on shake roofs, the shakes butted together, from alternating sides, at the roof peak, but just recently read that a ridge cap, consisting of cedar boards, is preferable for cedar shingles.

I can't see any reason why it wouldn't work with shakes, too, as long as the boards are thick enough.

On a regular asphalt shingle roof, using 3-tab shingles, the usual practice is to cut the shingle to separate the three tabs, then lay each crossways on the ridge, bending half onto each side of the roof, and partially overlapping it with the next one - sorta like I did with the faux cedar shingles on my model.

Wayne

  • Member since
    January 2017
  • From: Southern Florida Gulf Coast
  • 18,255 posts
Posted by SeeYou190 on Sunday, April 21, 2019 6:57 AM

SpaceMouse
In the real world, using roll shingles as you are doing, you would weave them, overlapping first one side then the other. 

.

This is what I was going to suggest.

.

I watched the crew put the new roof on my house, and this is what they did in the valley.

.

-Kevin

.

Living the dream.

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Sunday, April 21, 2019 7:18 AM

SeeYou190
SpaceMouse In the real world, using roll shingles as you are doing, you would weave them, overlapping first one side then the other. 

SeeYou190
This is what I was going to suggest.

That's fine for valley's but Henry is asking about the ridge, and Wayne's explanation is great.

And his explanantion on how a ridge is done with 3 tabs, conventional or textured, is right on.

Maybe for modeling the shake ridge, you could cut two shingles from the sheet, and fold them in half, length wise, saddle them over the roof peak, and continue, leaving a reveal on each set of shingles as you go.

Mike.

  • Member since
    December 2015
  • From: Shenandoah Valley
  • 9,094 posts
Posted by BigDaddy on Sunday, April 21, 2019 8:05 AM

There must be somebody reading this thread who hasn't seen the Campbells shingles product.  This is a metric ruler, the cut part of the shingles are only 2.5mm.

I like Mel's idea of packing tape.

Henry

COB Potomac & Northern

Shenandoah Valley

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Sunday, April 21, 2019 8:12 AM

BigDaddy
There must be somebody reading this thread who hasn't seen the Campbells shingles product. 

That would be me!  Yea, Mel's idea looks good. Smile, Wink & Grin

OR, could you use the top part, that's not cut into shingles?

Mike.

  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Sunday, April 21, 2019 12:06 PM

For my crossing watchman's shanties, I used a "metal" (paper) ridge-cap, and didn't worry about how a real one would have been installed without the use of visible nails...

My hope is that viewers find them interesting enough that they don't bother questioning the particulars of prototypical construction. Whistling

Wayne

 

  • Member since
    January 2009
  • From: Bakersfield, CA 93308
  • 6,526 posts
Posted by RR_Mel on Sunday, April 21, 2019 12:25 PM

Mike’s idea works, I’ve done it that way as well as the folded brown tape.  I prefer the folded tape, no top gap using the folded tape.
 
On my last scratch build I tried Styrene shingles, they turned out pretty good but as long as I can get Campbell shingles that’s the way for me.  I’ve even put Campbell shingles on Styrene craftsman kits on top the Styrene shingles.
 
Mel
 
 
My Model Railroad   
 
Bakersfield, California
 
I'm beginning to realize that aging is not for wimps.
 
  • Member since
    July 2006
  • From: west coast
  • 7,667 posts
Posted by rrebell on Tuesday, April 23, 2019 10:45 AM

Like I said before, I use square stripwood that will fit in the valley at the ridge between the two roof peices, once stained it blends right in.

  • Member since
    December 2015
  • From: Shenandoah Valley
  • 9,094 posts
Posted by BigDaddy on Monday, April 29, 2019 7:06 PM

Follow up.

I used kraft paper and Elmers, which as far as I can tell is grocery bag paper.  The color is almost the same. 

Henry

COB Potomac & Northern

Shenandoah Valley

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Monday, April 29, 2019 7:48 PM

Looks great Henry.  Yes

Mike.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!