Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

OK: Time to get my universe unfolding as it should..? next step

593 views
5 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2007
  • 160 posts
OK: Time to get my universe unfolding as it should..? next step
Posted by Gerome on Saturday, May 3, 2008 1:58 AM

OK.

I have structures, level crossing materials, track in place and running smoothly.

What is the common wisdom on the sequence?  I am thinking

1. ballasting

2. placing structures

3. create roadways to the townsite/downtown

4. telephone poles

5. ground cover (don't want to place structures on top of grass and tumble weeds. (modelling semi-arid) and cut it away...better to bring grass and weeds etc. up to structure foundations after structures are in place??

6. individual veggies, trees etc. 

7. last minute trackside and town site details...garbage cans, etc., mileage signs, static signals etc. 

I kind of have so many balls up in the air that I am paralyzed by indecision.

  • Member since
    May 2007
  • From: North Myrtle Beach, SC
  • 995 posts
Posted by Beach Bill on Saturday, May 3, 2008 7:54 AM

Congratulations on "running smoothly"!! 

I'd agree with the ballasting as the next step.  It has to be done, and you want all of your ballast to look the same.   If you do some ballasting now and then buy another bag a year from now it might not be the same color.

Adding structures and related details is one of the favorite parts for me.   There is no reason why you can't place buildings, ground-cover, and details on one area of the layout.  If you place those structures along that spur, for example, it will be much more pleasurable to spot some cars in there.  The whole layout doesn't have to develop on one step-by-step plan, especially if you have operations well in hand.   When I finished ballasting (which is a messy and time-consuming task for me) I decided to build a couple structure kits (one of the "best" tasks in my view) to reward myself for getting that done.

Most of all though, when feeling "overwhelmed" by all the tasks:  DO Something.  The little improvements will add up but if things just sit it can result in some loss of interest.

Bill

With reasonable men, I will reason; with humane men I will plead; but to tyrants I will give no quarter, nor waste arguments where they will certainly be lost. William Lloyd Garrison
  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Saturday, May 3, 2008 8:00 AM
IT's just me, but I like to get the scenery done ASAP as much as I can without encroaching on my buildings. Then I build the structure, paint it to match the location, and set it into place, then I add the landscaping and details to get that section done. Then I repeat with the next one.  

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    August 2004
  • From: Amish country Tenn.
  • 10,027 posts
Posted by loathar on Saturday, May 3, 2008 9:38 AM
I'd do my roads and scenery allowing for structure placement. THEN do my ballast. Then place buildings and trees and poles last.
  • Member since
    October 2006
  • From: Prescott, AZ
  • 1,736 posts
Posted by Midnight Railroader on Saturday, May 3, 2008 11:22 AM

I always ballast LAST, so the ballast covers up ay rough edges of the scenery near the track.

  • Member since
    October 2005
  • From: Ulster Co. NY
  • 1,464 posts
Posted by larak on Saturday, May 3, 2008 12:08 PM

 SpaceMouse wrote:
IT's just me, but I like to get the scenery done ASAP as much as I can without encroaching on my buildings. Then I build the structure, paint it to match the location, and set it into place, then I add the landscaping and details to get that section done. Then I repeat with the next one.  

  with two t's

Pretty much the same except that I definately prefer to let the track settle in (and get adjusted if necessary) for several hundred passes of train or six months, whichever comes first, BEFORE ballasting. Then I do minor scenery touchup near the ballast. 

Track or base may move and you want the track bullet proof before you lock it into place with ballast.

Just my inflationary three cents.  

Karl 

The mind is like a parachute. It works better when it's open.  www.stremy.net

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!