Login
or
Register
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Home
»
Model Railroader
»
Forums
»
Layouts and layout building
»
BAH R.R. tour - photo intense
Edit post
Edit your reply below.
Post Body
Enter your post below.
[quote user="Canondale61"] <p>Yes gives the viewer an idea of the overall size </p><p>Thank you</p><p>Kevin</p><p>[/quote]</p><p>I will see what works for the yearly update - thanks.</p><p><strong>Weekly update.</strong></p><p>Friday/Saturday - I got the replacement turnout installed on the main into Between. I initially set the turnout at the same location as the old one. It was there because that is where the Atlas snap switch was originally installed. Since the Fast Tracks # 4.5 is not an "exact" drop in for the Atlas snap switch; I had to really work to make it function in the same location. The result was a curve that was a little under 18" radius. Here it is, pinned in place.</p><p>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/060907-003_r.jpg[/IMG]</p><p>I decided that as long as I was reworking the whole area; that the turnout should be moved to make the curve into Between a "real 18" radius". I moved it 4" toward the camera position. This required trimming the small hill resulting from cutting the mountain for track access to Between. I got everything cut and installed and tested with both the switcher and 4-6-0. I could run both, with normal consists, forward and backward at over twice normal operational speed with absolutely no problems. Here is the installation.</p><p>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/060907-006_r.jpg[/IMG]</p><p>I cleaned up and put in a little plaster ground cover. I will run things for a week or so before doing the preliminary landscaping in the area. I did have to rearrange the uncoupling magnets in Between due to the new curve in the lead in track.</p><p>[IMG]http://i111.photobucket.com/albums/n123/Alan_B/060907-008_r.jpg[/IMG]</p><p>Replacing the three turnouts in Between did teach me that simple things sometimes get very complicated. I will be replacing other snap switches with the Fast Tracks turnouts; however it will be done with the knowledge that it will not be an easy replacement. Now I can get back to some of the other areas that need landscape work.</p><p>Comments ?</p><p> </p>
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Users Online
There are no community member online
Search the Community
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter
See all
Sign up for our FREE e-newsletter
and get model railroad news in your inbox!
Sign up