Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

About to start the mountain I think???

1216 views
7 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    April 2003
  • 305,205 posts
About to start the mountain I think???
Posted by Anonymous on Monday, August 6, 2007 9:41 AM

Heres what I've done so far.

 -I've got a sheet of grass down.

-I've got all of the road bed down.

-I've got all of the track down and wired up correctly.

-Now I was going to start on the mountain...

 I'm using the "Mountain scenic valley" set up, that usually retails about 70-85 dollars..

Was this a good choice?  Am I doing this in the right order?  Is there something I need to do before my mountain?

Any tips before starting my mountain?  There seems to be a lot involved...

 

Thanks,

Brandon

  • Member since
    July 2006
  • From: North Texas
  • 66 posts
Posted by Mike B on Monday, August 6, 2007 12:02 PM

I started my scenery a couple of months ago using wood profile boards covered by cardboard strips, Woodland Scenics plaster cloth and then adding rock molds so I can't speak specifically to your situation. However, here is how I approached it:  I have three distinct mountain areas that are seperated by trackage (a.) a small triangular area in one corner, (b.) a medium mountain and (c.) a large mountain with a tunnel.  For each step I started with the small triangle and if it looked OK I then proceeded to the medium mountain and if it looked OK I than proceeded to the large mountain.  This way I could get a feel for the materials and techniques I was using on a very small scale before risking working on the larger areas.  If I really messed anything up I felt comfortable that I could tear it out and start again with minimal effort.  I didn't have to start over again but it gave me great piece of mind and I didn't waste as much time and materials when I got to the larger areas.  I think the hardest part of scenery making is just overcoming the fear of starting.

 Good luck, Mike B.

  • Member since
    November 2005
  • 1,223 posts
Posted by jeffers_mz on Monday, August 6, 2007 12:31 PM

The first step is design.

Real mountains are usually ridges, longer than they are wide. Individual "peaks" are where three, sometimes four, ridges intersect.

If you slice through a mountain perpendicular to the ridge, you get a pretty standard cross section. Flatter towards the ridge, then it steepens to around 45 degrees max, at the middle of the slope, then curves into a flatter valley, with a little gully at the creek or river. You can save some horizontal real estate, and gain some vertical elevation quickly using strategically placed cliffs.

Oftentimes, larger wide valleys are formed when there's a landslide that dams up the creek. Over millions of years, the "reservoir" behind the "dam" silts up to the point where you're back to a creek in a valley, but in this case, the valley floor is near flat except for the tiny gulley at the creek, and the valley walls don't curve down to a sloped valley floor, they transition rather abruptly from steep to flat.

Look at as many pictures of mountains like you want on your layout as you can. Get a good feel for how you want your mountains to look before you start building. Then when you know what you want the end result to be, feel free to ask about techniques to achieve a specific result.

Don't forget to leave access to any track that runs into or under a mountain!

 

:-)

 

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Monday, August 6, 2007 1:06 PM
Mike.. Thanks so much!  I think you already saved me some trouble.. staring small (like a corner) to big.  Knowing me I probably would have started on the biggest part first, so I really appreciate your advice!
  • Member since
    August 2004
  • From: Amish country Tenn.
  • 10,027 posts
Posted by loathar on Monday, August 6, 2007 3:16 PM
Do your ballast last except for any tunnels you may have. Are you talking about the Woodland Scenics product? I'm curious to find out if they give you enough material to actually do the job. Let us know.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Monday, August 6, 2007 3:58 PM

Yes ...thats it Woodland Scenics!

 

I will let you know how it turns out.  Because of lack of time it will take me awhile to complete the project.  It says there is enough material to do a 4 x 8. 

 The directions aren't very good though...

  • Member since
    August 2004
  • From: Amish country Tenn.
  • 10,027 posts
Posted by loathar on Monday, August 6, 2007 5:59 PM
That's because they want you to spend $20 more and buy their "how to" video.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Tuesday, August 7, 2007 11:28 AM
hahaha, scam!

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!