Login
or
Register
Home
»
Garden Railways
»
Forums
»
Garden Railroading
»
GRR Construction Begins!
Edit topic
Updated your discussion topic below.
Subject
Enter a subject for your topic. Maximum 150 characters.
Post Body
Enter your post below.
Hello All, <br /> <br />I began construction of my GRR this past weekend. I’ve decided to build my RoW using Bill Logan’s flexible roadbed system. I ordered 48 HDPE 2X4X8’s from EPS in IL which were delivered last Thursday. After running them thru my surface planer on Saturday, I began ripping the ¾” wide roadbed rails Sunday AM. (I’m using a 10” 30T Freud rip blade on my TS.) When sawn, HDPE generates static charged shavings which stick to EVERYTHING. I fab’d a hood so my dust collection system could keep the mess under control. <br /> <br />[IMG]http://img150.imageshack.us/img150/425/roadbed12hr.jpg[/IMG] <br /> <br />A happy but dog tired, GRR’r. 640’ of roadbed rail ripped, enough to support 320’ of track. <br /> <br />[IMG]http://img109.imageshack.us/img109/969/roadbed27rv.jpg[/IMG] <br /> <br />This week I’ll crosscut the spacer blocks (500+) and start screwing the roadbed rail together. Stay tuned and thanks for peekin'. [:)].
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
E-mail Subscribe
Check the box below if you want to receive e-mail notifications when replies are made to this thread.
Receive notifications
Update Discussion Topic
Search the Community
FREE EMAIL NEWSLETTER
Get the
Garden Railways
newsletter delivered to your inbox twice a month
Sign up
By signing up you may also receive occasional reader surveys and special offers from
Garden Railways
magazine. Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy