Login
or
Register
Home
»
Garden Railways
»
Forums
»
Garden Railroading
»
The Rock Island Backyard DSM, IA Division (My layout plan, & now construction )
Edit post
Edit your reply below.
Post Body
Enter your post below.
<P><FONT size=4>Mainline is DONE! -as in all track is now in on the mainline. It took about 8 hours to complete (with several breaks). As stated before all but up by the house (and thru the patio) is all double track, and the track with the wye in it is counted as a secondary single track main. The wye only needs about 15 minutes more worth of work and it will be done (I need to cut rail, too noisy after 10pm). The main line was completed at about 9:55 pm, then I ran trains with my friend Doug (who spent the day ballasting track, semi-prototypically using an open hopper). It was a blast to finally run 2 trains at once in oposite directions. </FONT></P> <P><FONT size=4> Total track laid to date is about 420 feet long give or take a foot or two. Not bad in an area that is 70'x~50') with most of that area taken up by flower beds/grass/pond.</FONT></P> <P><FONT size=4> Of course much work yet to be done: walkways to replace/reset (and their associated walkway lights), yard lead to create, leads to the future industrial areas, lead to the basement window staging area, fill next to much of the new concrete, then ballasting the newly laid track, all which must be done in the next couple weeks. </FONT></P>
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Search the Community
FREE EMAIL NEWSLETTER
Get the
Garden Railways
newsletter delivered to your inbox twice a month
Sign up
By signing up you may also receive occasional reader surveys and special offers from
Garden Railways
magazine. Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy