Login
or
Register
Home
»
Garden Railways
»
Forums
»
Garden Railroading
»
picture test
Edit post
Edit your reply below.
Post Body
Enter your post below.
[quote]QUOTE: <i>Originally posted by Rocky_goat</i> <br /><br />I like that layout construction in that picture [:)] That is what I wi***o do after I move and reset up the newer, larger, improved layout. I think I will go a little higher than 3 rows of brick, if we are looking at the 26 pounders) to get the track level about 3 feet off of the ground [;)][:)][^] <br />[/quote] <br />1) Dig trench for base <br />2) bring gravel in about 1" to 3" rocks <br />3) rent a tamper wear vibration gloves too <br />4) make dang sure it is all level either with laser or long house level <br />5) start placing in bottom row <br />6) second row going start spiking it <br />7) keep going <br />8) your choice to fill the spike holes up with mortor <br /> <br />If you want real grat drainage use a holed pipe behind the paver stones and back full with the rest of the stone left over from the bottom. Enjoy [:D]
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Search the Community
FREE EMAIL NEWSLETTER
Get the
Garden Railways
newsletter delivered to your inbox twice a month
Sign up
By signing up you may also receive occasional reader surveys and special offers from
Garden Railways
magazine. Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy