Trains.com

Tracks Level !!!

1065 views
1 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    February 2013
  • 1 posts
Tracks Level !!!
Posted by cchatdeau on Saturday, February 2, 2013 3:53 PM

Sorry abouht my english..

I would like to know a manny inches long I need for each inches level...

I should like build a garden train in my bac yard...You can see on youtube, cchatdeau, Koi Ile Bizard

Tanks for information..

cchatdeau

  • Member since
    March 2002
  • From: Norton, MA
  • 394 posts
Posted by piercedan on Sunday, February 3, 2013 7:09 AM

Whether metric or inches/feet, grades are measured as a percent of rise.

So, a 100 inch long track that rises 2 inches is 2 per cent.

1000 cm that rises 20 cm is 2 per cent.

SO . select the grade (2 per cent would be good, or if space permits even less) and then the clearance height (has to be top of rail to top of rail, and you will get the length needed for clearance.

SO if 1 per cent and 12 inches top of rail to top of rail, you get 1200 inches/100 feet!!

A long distance and this is why many go to 3 percent grades and use helper engines.

Search the Community

FREE EMAIL NEWSLETTER

Get the Garden Railways newsletter delivered to your inbox twice a month

By signing up you may also receive occasional reader surveys and special offers from Garden Railways magazine. Please view our privacy policy