Trains.com

Adding Switching Operations To A Small Layout

859 views
1 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    May 2017
  • 7 posts
Adding Switching Operations To A Small Layout
Posted by Barry G. Milstead on Monday, May 1, 2017 11:17 AM

 In the March issue of CTT, a gentleman wrote recommending adding switching capabilities to a small layout in order to enhance it's enjoyment.  I agree whole-heartedly, and would like to add two points. First, if one has the space, related accessories could be used on two separate sidings. Say one siding has a log loader. The load could be taken around the layout a few times before being delivered at a sawmill on the second siding. This adds to the fun of operation.

 Second point, Space always being at a premium, one can swap out operating accessories along their sidings periodically as the want or need arises. The same wiring can often be used to connect the replacement accessory for it's turn on the siding, ready to be put to work.

 Barry G. Milstead

  • Member since
    May 2017
  • 7 posts
Posted by Barry G. Milstead on Thursday, May 4, 2017 8:37 AM

 Hoping to clarify the last point, when working with a small, semi- permanent type layout, one can solder (or sometimes crimp) the "U" shaped electrical terminals on the ends of your accessory feeder wires. That way, when you need or want to change the accessory on the siding, the wiring is easy to disconnect from one piece and reconnect to the next one. Say you're tired of loading logs. You can transition over to loading coal or whatever else, in a matter of minutes with minimum effort.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

FREE EMAIL NEWSLETTER

Get the Classic Toy Trains newsletter delivered to your inbox twice a month