QUOTE: The development of the 2-8-4 wheel arrangement for steam locomotives was a result of an effort by the Lima Locomotive Works to improve on the speed and horse power of the USRA Mikado (2-8-2) locomotive, which was designed by the United States Railroad Administration during World War I. The USRA design had difficulty keeping up steam over long periods and often experienced wheel slippage. Lima Locomotive Works' engineer William E. Woodward started with a New York Central Class H-7 "Mikado" type locomotive and added a larger firebox, creating an experimental Class H-10 "Mikado". He then went one step further and designed a locomotive with a 100 square foot firebox. This larger firebox required a four-wheel trailing truck to support it. The resulting locomotive was designated Class A-1, and it was the first 2-8-4. This new 2-8-4 locomotive was sent to the Boston & Albany Railroad by Lima in the early spring of 1925 for test on that railroad. In several test runs over a division of the railroad that crossed the Berkshire Hills, the demonstration locomotive, which carried road number "1" hauled up to 2500 tons. The most dramatic test occurred on April 14, 1925. A Class H-10, 2-8-2 "Mikado" type steamed eastbound from the Selkirk Yard pulling a 46 car, 1691 ton, train. About 47 minutes later the Class A-1 demonstrator led a 54 car, 2296 ton, train up the same eastbound climb through the Berkshires. The demonstrator Class A-1 arrived at North Adams Junction ten minutes ahead of the Class H-10. Soon after these impressive tests the Boston & Albany ordered forty-five of these new locomotives, which quickly became known as "Berkshires".
QUOTE: Originally posted by Leon Silverman The Philadelphia Museum housing the 4-10-2 is the Franklin Institute.
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Get the Classic Trains twice-monthly newsletter